Appendix B to Part 213--Schedule of Civil
Penalties
| Subpart A--General: |
Violation |
Willful Violation |
| 213.4(A) Excepted track 2........................................ |
$2,500 |
$5,000 |
| 213.4(B) Excepted track2.......................................... |
$2,500 |
$5,000 |
213.4(C) Excepted track 2......................................
|
$2,500 |
$5,000 |
213.4(D) Excepted track 2..........................................
|
$2,500 |
$5,000 |
- 213.4(E)
- (1) Excepted track
.....................................................
- (2) Excepted track
.....................................................
- (3) Excepted track
.....................................................
- (4) Excepted track
.....................................................
|
-
- $5,000
- $7,000
- $7,000
- $5,000
|
-
- $7,500
- $10,000
- $10,000
- $7,500
|
213.4(F) Excepted
track.............................................
|
$2,000 |
$4,000 |
|
213.7 Designation of qualified persons to supervise
certain
renewals and inspect track.........................
|
$1,000 |
$2,000 |
213.9 Classes of track: Operating speed
limits...........
|
$2,500 |
$2,500 |
213.11 Restoration or renewal of track under
traffic conditions....
|
$2,500 |
$2,500 |
| 213.13 Measuring track not under
load................... |
$1,000 |
$2,000 |
|
Subpart B-Roadbed:
213.33
Drainage.........................................................
|
$2,500 |
$5,000 |
| 213.37
Vegetation...................................................... |
$1,000 |
$2,000 |
|
Subpart C-Track Geometry:
213.53
Gage........................................................
|
$5,000 |
$7.500 |
13.55
Alignment.....................................................
|
$5,000 |
$7.500 |
213.57 Curves; elevation and speed
limitations..........
|
$2,500 |
$5,000 |
213.59 Elevation of curved track;
runoff.....................
|
$2,500 |
$2,500 |
| 213.63 Track
surface................................................. |
$5,000 |
$7,500 |
|
Subpart D-Track surface:
213.103 Ballast;
general.............................................
|
$2,500 |
$5,000 |
|
213.109 Crossties
(A) material
used.....................................................
(B)
Distribution of ties...........................................
(C)
Sufficient number of non-defective ties...........
(D) Joint
ties...............................................
(E) Track
constructed without crossties..........
|
$1,000
$2,500
$1,000
$2,500
$2,500 |
$2,000
$5,000
$2,000
$5,000
$5,000 |
213.113 Defective
rails...........................................
213.115 Rail end
mismatch......................................
213.119 Continuous welded rail (a) through
(h)..........
213.121 (A) Rail
joints...............................................
213.121 (B) Rail
joints..............................................
213.121 (C) Rail
joints..............................................
213.121 (D) Rail
joints..............................................
213.121 (E) Rail
joints...............................................
213.121 (F) Rail
joints...............................................
213.121 (G) Rail
joints...............................................
213.121 (H) Rail
joints................................................
213.122 Torch cut
rail.................................................
213.123 Tie
plates...................................................
213.127 Rail
fastenings.....................................
213.133 Turnouts and track crossing,
generally........
|
$5,000
$2,500
$5,000
$2,500
$2,500
$5,000
$2,500
$2,500
$2,500
$2,500
$5,000
$2,500
$1,000
$2,500
$1,000 |
$7,500
$5,000
$7,500
$5,000
$5,000
$7,500
$5,000
$5,000
$5,000
$5,000
$7,500
$5,000
$2,000
$5,000
$1,000 |
|
213.135 Switches:
(A) through
(G).................................................
(H) chipped or worn
points......................................
213.137
Frogs.....................................................
213.139 Spring rail
frogs.............................................
213.141 Self-guarded
frogs.......................................
213.143 Frog guard rails and guard faces;
gage...........
Subpart E-Track appliances and track- related devices:
213.205
Derails..........................................................
|
$2,500
$5,000
$2,500
$2,500
$2,500
$2,500
$2,500
$2,500 |
$5,000
$7,500
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000 |
|
Subpart F-Inspection:
213.233 Track
inspections..........................................
213.235 Switches, crossings, transition
devices..........
213.237 Inspection of
rail..........................................
213.239 Special
inspections....................................
213.241 Inspection
records..................................
|
$2,000
$2,000
$2,500
$2,500
$1,000 |
$4,000
$4,000
$5,000
$5,000
$1,000 |
|
Subpart G-High Speed:
213.305 Designation of qualified individuals; general
qualifications
213.307 Class of track; operating
speed limits..............
213.309 Restoration or renewal of track under traffic
conditions
213.311 Measuring track not under
load.............
213.319
Drainage......................................................
213.321
Vegetation...........................................
213.323 Track
gage................................................
213.327
Alignment........................................................
|
$1,000
$2,500
$2,500
$1,000
$2,500
$1,000
$5,000
$5,000 |
$2,000
$5,000
$5,000
$2,000
$5,000
$2,000
$7,500
$7,500 |
213.329 Curves, elevation and speed
limits...................
213.331 Track
surface.................................................
213.333 Automated vehicle inspection
systems.............
213.335 Crossties
A) Material
used..........................................................
B) Distribution of
ties.................................................
C) Sufficient number of. non-defective ties,
non-concrete...
D) Sufficient number of non-defective concrete
ties............
E) Joint
ties......................................................................
F) Track constructed without
crossties.............................
G) Non-defective ties surrounding defective
ties.............
H) Tie
plates..................................................................
I) Tie
plates....................................................................
|
$2,500
$5,000
$5,000
$1,000
$2,500
$1,000
$1,000
$2,500
$2,500
$2,500
$2,500
$1,000 |
$5,000
$7,500
$7,500
$2,000
$5,000
$2,000
$2,000
$5,000
$5,000
$5,000
$5,000
$2,000 |
213.337 Defective
rails..............................................
213.339 Inspection of rail in
service............................
213.341 Inspection of new
rail..................................
213.343 Continuous welded rail (A) through
(H)......
213.345 Vehicle
qualification.................................
testing (A) through
(B).........................................
C) through
(E).............................................................
|
$5,000
$2,500
$2,500
$5,000
$5,000
$5,000
$2,500 |
$7,500
$5,000
$5,000
$7,500
$7,500
$7,500
$5,000 |
213.347 Automotive or railroad Crossings at
grade..........
213.349 Rail end
mismatch...........................................
213.351 (A) Rail
joints................................................
213.351 (B) Rail
joints..............................................
213.351 (C) Rail
joints.............................................
213.351 (D) Rail
joints............................
213.351 (E) Rail
joints...................................................
213.351 (F) Rail
joints...............................................
213.351 (G) Rail
joints....................................................
|
$5,000
$2,500
$2,500
$2,500
$5,000
$2,500
$2,500
$5,000
$5,000 |
$7,500
$5,000
$5,000
$5,000
$7,500
$5,000
$5,000
$7,500
$7,500 |
213. 352 Torch cut
rails.................................................
213.353 Turnouts, crossovers transition
devices.................
213.355 Frog guard rails and guard faces;
gage..................
213.357
Derails...............................................................
213.359 Track
stiffness.....................................................
213.361 Right of
way.......................................................
213.365 Visual
inspections..............................................
213.367 Special
inspections..............................................
213.369 Inspections
records........................................
|
$2,500
$1,000
$2,500
$2,500
$5,000
$5,000
$2,500
$2,500
$2,000 |
$5,000
$2,000
$5,000
$5,000
$7,500
$7,500
$5,000
$5,000
$4,000 |
1\ A penalty may be assessed against an individual only
for a willful violation. The Administrator reserves the right to assess a penalty of up to
$22,000 for any violation where circumstances warrant. See 49 CFR Part 209, Appendix A.
2\ In addition to assessment of penalties for each
instance of noncompliance with the requirements identified by this footnote, track
segments designated as excepted track that are or become ineligible for such designation
by virtue of noncompliance with any of the requirements to which this footnote applies are
subject to all other requirements of Part 213 until such noncompliance is remedied.
- Appendix A to part 213 -Maximum Allowable Curving
Speeds
Appendix
C to part 213 -Maximum Allowable Curving
Speeds
|